A glue down floor is usually a better choice in high traffic areas like commercial buildings and industrial spaces because the glue provides extra holding power.
Flooring installed with glue.
Engineered flooring can be installed above grade at grade and below grade level.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
Crawl spaces must be a minimum of 24 from the ground to underside of joists.
If the boards are less than 1 inch wide apply glue to the tongue of the installed boards and slide the last row into place using a pry bar and a piece of scrap wood to protect your wall.
Cut or rip the last row.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Though installation instructions may vary depending on manufacturer or installer typically loose lay flooring is installed by first gluing down planks or tiles around the perimeter of the space for small areas and applying adhesive in a grid formation for larger areas.
Then nail the baseboards and shoe moulding to.
Check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
Once your new floor is complete install transition pieces and remove the spacers.
Around the house the rooms with the most traffic such as the front hallway the kitchen and the recreation room are better served by glue down flooring than floating flooring but if you re considering a whole house.
When working on a clean concrete subfloor the glue down method is often the go to choice.