Typical values for moisture sensitive floor finishes are less than 0 5 water by weight or less than 75 relative humidity rh for impermeable floors and less than 1 w w for more permeable floors.
Floor screed moisture content before tiling.
The numerical values displayed in the lcd display represent the actual percent moisture content of wood mc and the wood moisture equivalent wme of concrete dry wall and other materials.
Before laying onto calcium sulfate screeds it is vital to ensure that the moisture content is at the correct level for the required floor finish.
For any kind of flooring the final floor finish vinyl tiles wood panelling carpets etc cannot be laid to perfection unless the screed on which it is laid has.
By michael hailwood director laticrete uk.
On average your screed will need around 60 days to cure completely and you should conduct a moisture test before laying your new floor finishes.
A high moisture content can affect the adhesive making the new tiles lose their bond and lift.
Moisture testing should be carried out after the commissioning of the ufh system but before any tiles are laid.
How important is it to assess the moisture content of screeds.
There s a quick and simple way of testing for moisture yourself but if you re pressed for time or want the reassurance of a professional test screed it can conduct a british.
Typically still dark in colour due to its moisture content.
Moisture testing of the screed where floor tiling is proposed.
Therefore it s advisable to have a floor tested for moisture content prior to installing flooring or moisture barriers.
Before tiling the area must be fully dry to ensure the adhesive will adhere to the tile and floor screed without issue.
Facebook twitter reddit pinterest whatsapp email link.
Tiles should be fixed using a 3mm deep solid layer of adhesive and a minimum 3mm joint should be left between tiles to accommodate movement and for grouting.
During this time shrinkage occurs to compensate for the volume loss of water.
Tiling a screed too soon whilst the substrate is still stabilising can result in tiles blowing away from their base heaving as the screed shrinks below.
Moisture testing is carried out using a suitable approved method such as a flooring hygrometer or carbide bomb test.
After this period retained water needs to evaporate away until a normal moisture content is reached.
What we should know before tiling them october 2017.
Whatever the old flooring is the moisture levels must never exceed a relative humidity of 75.
This is particularly important if you are working with a concrete subfloor.
The biggest issue that has always been associated with floor screeding is the long drying period that stands as a major hurdle in the early completion of flooring.